Skip to content
Sector

Online UPS for banks and ATM networks

The engineering is simple. The problem is doing it identically across sixty sites and knowing which battery bank fails next month.

Book a site survey

Request a quote

About Banking & ATM Networks. We reply within one working day.

e.g. 12 kW IT load, or 60 kVA three phase

Equipment on the circuit, backup time needed, site location, and any deadline.

+91 86686 14124
Banking & ATM Networks — power systems supplied by Extreme Power System, Pune

What actually goes wrong

A single branch UPS is a straightforward specification. A network of them is a fleet management problem: sites installed by different vendors over ten years, no consistent record of battery ages, and failures discovered by a customer complaint rather than by a report.

Working in banking & atm networks

Specification stage

What to get right

The decisions on this list are the ones that are expensive to change after the equipment is on site.

  • Standardised specification

    One configuration across the fleet means one spares holding and predictable replacement planning.

  • Unattended sites

    ATM kiosks have nobody on site. Remote alarm reporting is what converts a silent failure into a scheduled visit.

  • Battery age tracking

    Fleet-wide age and capacity records turn replacement into a budgeted annual programme instead of a series of emergencies.

  • Air-conditioned kiosks

    The AC is often on the same supply. Decide deliberately whether it is on the UPS, because it roughly doubles the rating if it is.

  • Rollout logistics

    Multi-site installations need a schedule, a single point of contact and consistent handover documents per site.

  • Rental cover

    A small rental pool covers sites during repair so a branch is never running unprotected.

Typically specified

What we supply into this sector

Banking & ATM Networks — questions we get asked

Anything not covered here, call us — most of it is faster to answer on the phone.

What UPS capacity does a bank branch need?

A typical branch — teller workstations, a server or NVR, network gear, printers — lands between 5 and 10 kVA. The number moves a great deal depending on whether the air conditioning is on the UPS, so decide that first; it often doubles the rating.

Can you handle AMC across multiple branches?

Yes. Multi-site contracts are priced per site with a common response window, a single coordinator and a consolidated fleet report showing battery ages and capacity trend across every location — which is usually the part that makes replacement budgeting possible.

We will do the load grading with you

Site survey, load list and a single-line diagram before anything is quoted. That is where the specification is actually decided.

Book a survey

Request a quote

About Banking & ATM Networks enquiry. We reply within one working day.

e.g. 12 kW IT load, or 60 kVA three phase

Equipment on the circuit, backup time needed, site location, and any deadline.

Call
Reply within one working daySite survey before anything above 20 kVAAny make serviced