UPS service and AMC in Pune

Most UPS failures are not sudden — a dried capacitor, a stopped fan, one weak cell in a string of sixteen. All of it is visible on a scheduled visit and invisible on the front panel. That is what these contracts are for.

What service actually covers

Six contracts, all available on equipment we did not build. Annual maintenance, installation and commissioning, repair and overhauling, battery testing and replacement, rental, and buyback of old units. Any make — the service book carries more other-brand machines than our own.

The distinction that matters when you compare quotations is what a visit contains. A quarterly visit that measures float voltage and files a report is not a battery test; it tells you the charger works. A load test, cell by cell against rated capacity, is the only thing that answers how long the bank will actually hold — and it is the line most contracts leave out because it takes an engineer half a day rather than twenty minutes.

The same applies to response times. Four hours means little without a definition of when the clock starts and what happens when it is missed. Ours starts when the call is logged, not when it is triaged, and the AMC states the remedy in writing.

Whose equipment we work on

Any make of UPS, stabilizer, rectifier or charger, whatever the badge. Give us the make, model, year and battery configuration and we confirm spares availability before committing to a response time, because a contract we cannot honour is worth less than an honest no.

Machines out of manufacturer support are usually still serviceable at component level. A board is diagnosed to the failed component and repaired rather than swapped — which is often the difference between a repair and a replacement quotation.

Service engineer taking meter readings inside a UPS cabinet during a scheduled maintenance visit
Any make

UPS Annual Maintenance Contract

Quarterly preventive visits, an annual battery load test rather than a voltage check, and a breakdown line that answers. Any make — not only ours.

  • Quarterly PM
  • 24×7 breakdown
See the process
Termination and commissioning checks being carried out on a newly installed three phase UPS
Site survey

UPS Installation & Commissioning

From the site survey and cable schedule through battery rack assembly to a witnessed load-bank test and a signed commissioning certificate.

  • Cable schedule
  • Load bank test
See the process
Component level board repair on a UPS inverter card at the Pune works
Any make

UPS Repair & Overhauling

Component-level diagnosis, not board swapping. On site where we can, at the works where the job needs a bench and a load bank.

  • Component level
  • On-site or works
See the process
Engineer retrofitting a new UPS alongside the legacy transformer cabinet it replaces
Any make

UPS Upgradation & Retrofit

A machine that no longer suits the load is not always a machine that needs replacing. Any make — we assess what the existing unit can still carry and upgrade what actually limits it.

  • Capacity & bank
  • Controller retrofit
See the process
Cell by cell voltage readings taken across a UPS battery bank on site in Pune
Discharge test

UPS Battery Testing & Replacement

A float voltage reading tells you a failing cell is fine. A discharge test tells you the truth. We measure delivered capacity and give you the number.

  • Cell-by-cell impedance
  • Safe disposal
See the process
Rental UPS units being unloaded at a customer site in Pune
1–100 kVA

UPS on Rent

Daily, monthly or annual hire from 1 kVA to 100 kVA, with delivery, installation and maintenance included. Useful when the requirement is temporary — or when you want to test before you commit capital.

  • Daily to annual
  • Delivery included
See the process
Old UPS units being collected for buyback against a replacement unit
Any make

Old UPS Buyback & Exchange

A valuation on site, the old unit taken away, and the amount set against a new one. Any make, working or not.

  • Working or not
  • On-site valuation
See the process