UPS on rent
Daily, monthly or annual hire from 1 kVA to 100 kVA, with delivery, installation and maintenance included. Useful when the requirement is temporary — or when you want to test before you commit capital.

- 05
- Steps in the process
- 7
- Equipment types covered
- Any make
- Not only ours
- Same day
- Pune & PCMC response
What this covers, and why it is done this way
Not every power requirement justifies a purchase. A construction site needs protection for eighteen months. A data-centre migration needs temporary capacity for six weeks. An exhibition needs clean power for four days. A plant needs cover while its own unit is being overhauled.
Rental also solves a procurement problem. If you are not certain a 20 kVA unit is the right size, running a rented one on the actual load for a month gives you a measured answer instead of a spreadsheet estimate — and the rental cost is a fraction of getting the purchase wrong.
Every rental unit is load-bank tested before it leaves and comes with a fresh battery bank. Delivery, installation, maintenance and collection are included in the rate.
Step by step
- 1
Requirement call
Load, duration, backup time needed, site access and supply type.
- 2
Quotation
All-inclusive rate covering delivery, installation, maintenance and collection. No separate mobilisation charge.
- 3
Delivery and installation
Typically within 24–48 hours within Pune and Pimpri-Chinchwad, subject to availability.
- 4
Cover during hire
Breakdown attendance and a replacement unit if the hired machine fails. Cover runs for the full hire period.
- 5
Collection
Dismantling and collection at the agreed end date, or conversion to purchase with rental paid to date adjusted against the price.
UPS on Rent — questions we get asked
Anything not covered here, call us — most of it is faster to answer on the phone.
What does UPS rental cost in Pune?
The rate depends on capacity, backup duration and hire period. Longer hires carry a substantially lower monthly rate, and daily event rates are higher because delivery and collection are compressed into the same job. Tell us the load and duration and you will have a figure the same day.
What is the minimum rental period?
One day for events. For site and industrial use the practical minimum is a month, because installation and commissioning make anything shorter poor value for both sides.
Can rental be converted to purchase?
Yes. On long-term hires we adjust a proportion of the rental paid against the purchase price if you decide to keep the unit. The proportion is agreed at the start and written into the hire agreement.
Where we attend
Everything is built at our Pune works and delivered, installed and commissioned across the city and the industrial belt around it.
Outside these areas we contract individually against distance, and we will tell you honestly if the response time you need is not one we can hold to. All areas served
Other services

UPS Annual Maintenance Contract
Quarterly preventive visits, an annual battery load test rather than a voltage check, and a breakdown line that answers. Any make — not only ours.

UPS Installation & Commissioning
From the site survey and cable schedule through battery rack assembly to a witnessed load-bank test and a signed commissioning certificate.

UPS Repair & Overhauling
Component-level diagnosis, not board swapping. On site where we can, at the works where the job needs a bench and a load bank.
Talk to someone who has done this before
Tell us the make, rating and age of the equipment and we will tell you what is realistic — including when the honest answer is that it is not worth doing.






















