Skip to content
Service · Pune & PCMC

UPS annual maintenance contracts

Quarterly preventive visits, an annual battery load test rather than a voltage check, and a breakdown line that answers. Any make — not only ours.

Any makeQuarterly PM24×7 breakdownLoad-tested batteries
Request this service

Request a quote

About UPS Annual Maintenance Contract. We reply within one working day.

e.g. 12 kW IT load, or 60 kVA three phase

Equipment on the circuit, backup time needed, site location, and any deadline.

+91 86686 14124
Service engineer taking meter readings inside a UPS cabinet during a scheduled maintenance visit
06
Steps in the process
7
Equipment types covered
Any make
Not only ours
Same day
Pune & PCMC response

What this covers, and why it is done this way

Most UPS failures are not sudden. A fan bearing dries out, the enclosure fills with dust, one cell in a string of sixteen loses capacity, and the machine keeps reporting healthy right up to the moment it drops the load. The whole value of an AMC is catching that on a scheduled Tuesday rather than during a shift.

The part that distinguishes a real contract from a paper one is the battery test. A voltage reading on a floating battery tells you almost nothing — a failing cell reads normal at rest. We put the bank on a discharge test at rated load and measure actual delivered capacity, once a year, and the reading goes on your report.

We hold contracts on UPS systems, stabilizers, rectifiers and lift inverters from every major make, not only equipment we built.

How the work runs

Step by step

  1. 1

    Site audit

    Asset list, ratings, battery ages, installation photographs, load profile. Done before the contract is priced, at no charge.

  2. 2

    Contract scoping

    Comprehensive (parts included) or non-comprehensive (labour and consumables only), priced against the audit rather than a rate card.

  3. 3

    Quarterly preventive visit

    Cabinet clean-down, torque check on all power terminations, fan and filter service, thermal scan of connections, DC bus and float voltage check, cell-by-cell readings, alarm log review.

  4. 4

    Annual battery load test

    Discharge test at rated load with measured delivered capacity, cell by cell. Cells below 80% of rated capacity are flagged for replacement before they fail.

  5. 5

    Breakdown response

    Telephone diagnosis first, then site attendance within the contracted window. Emergency line runs 24×7 for AMC customers.

  6. 6

    Annual report

    Trended readings across all four visits, so degradation shows as a slope rather than a surprise, with a written replacement forecast.

UPS Annual Maintenance Contract — questions we get asked

Anything not covered here, call us — most of it is faster to answer on the phone.

What does a UPS AMC cost in Pune?

It is priced per asset, against capacity, age, make and the response time you need. As a rough guide, a non-comprehensive contract typically runs a few percent of the equipment’s replacement value per year, and comprehensive runs meaningfully higher because spares are carried. The site audit is free and the quote follows from it.

Comprehensive or non-comprehensive?

Comprehensive includes spare parts, so your cost is fixed and predictable — sensible for older equipment or where a failure is expensive. Non-comprehensive covers labour, visits and consumables, with parts billed as used — usually better value for equipment still under three or four years old.

Will you service a UPS from another manufacturer?

Yes. A significant part of our AMC book is other makes. What we need is the model, rating, year and battery configuration so we can confirm spares availability before we commit to a response time.

How quickly do you attend a breakdown?

Within Pune and Pimpri-Chinchwad the standard contracted window is same-day attendance for a load-down call, with the 24×7 line staffed for AMC customers. Outstation sites are contracted individually against distance. Whatever we agree goes into the contract in writing.

Coverage

Where we attend

Everything is built at our Pune works and delivered, installed and commissioned across the city and the industrial belt around it.

Outside these areas we contract individually against distance, and we will tell you honestly if the response time you need is not one we can hold to. All areas served

Other services

Talk to someone who has done this before

Tell us the make, rating and age of the equipment and we will tell you what is realistic — including when the honest answer is that it is not worth doing.

Request this service

Request a quote

About UPS Annual Maintenance Contract. We reply within one working day.

e.g. 12 kW IT load, or 60 kVA three phase

Equipment on the circuit, backup time needed, site location, and any deadline.

Call
Reply within one working daySite survey before anything above 20 kVAAny make serviced