Skip to content
Sector

Online UPS and isolation transformers for hospitals

The load list in a hospital is not one load. Theatres, imaging, ICU and the server room each need a different answer, and the specification has to hold up in an NABH audit.

Book a site survey

Request a quote

About Hospitals & Diagnostics. We reply within one working day.

e.g. 12 kW IT load, or 60 kVA three phase

Equipment on the circuit, backup time needed, site location, and any deadline.

+91 86686 14124
Hospitals & Diagnostics — power systems supplied by Extreme Power System, Pune

What actually goes wrong

Hospital power is graded by how long the load can be off. An operating theatre light and a ventilator can tolerate nothing. An MRI gradient amplifier draws enormous pulsed current and objects to a supply that sags under it. A CT scanner is intolerant of common-mode noise on the earth reference. And the whole essential-services board has to transfer to the DG and back without anyone in the building noticing. One 100 kVA UPS across the lot is the wrong shape of solution.

Specification stage

What to get right

The decisions on this list are the ones that are expensive to change after the equipment is on site.

  • Theatres and ICU — IT earthing

    Operating theatres and intensive care are usually wired as IT (isolated terra) systems: an ultra isolation transformer plus an insulation monitoring device, so a first earth fault raises an alarm instead of tripping the supply during a procedure.

  • Imaging — pulsed load

    CT and MRI draw short, very high current pulses. UPS and cable sizing must be against the peak, not the average, or the voltage sags every time the machine fires.

  • Noise floor

    Monitoring and imaging equipment measures microvolt signals. Ultra isolation with over 100 dB common-mode attenuation is standard practice, not an upgrade.

  • Lift rescue

    Stretcher and passenger lifts need a lift inverter so a car does not stall between floors during a power cut. This one gets found in audits.

  • Battery room siting

    Hydrogen venting and heat mean the battery bank does not belong in an unventilated cupboard beside the plant room. Runtime is set by ambient temperature as much as by Ah.

  • Documented maintenance

    Accreditation requires evidence of preventive maintenance and battery testing. Our AMC report is written so it can be handed straight to an auditor.

Typically specified

What we supply into this sector

Hospitals & Diagnostics — questions we get asked

Anything not covered here, call us — most of it is faster to answer on the phone.

What UPS capacity does a hospital need?

It is not one figure. Split the load into grades: no-break (theatres, ICU, ventilators, imaging consoles), short-break (lifts, general lighting, HVAC controls) and non-essential. Size a UPS against the no-break load with headroom for the pulsed peaks, and let the DG and ATS cover the short-break load. We do the load grading as part of the survey.

Why does imaging equipment need an isolation transformer?

Two reasons. It gives the machine a separately derived, cleanly earthed neutral, which removes earth-loop noise from the signal chain. And in an IT-earthed theatre or ICU it is what makes a first earth fault an alarm rather than a trip. Most imaging manufacturers specify it explicitly in their site preparation documents.

We will do the load grading with you

Site survey, load list and a single-line diagram before anything is quoted. That is where the specification is actually decided.

Book a survey

Request a quote

About Hospitals & Diagnostics enquiry. We reply within one working day.

e.g. 12 kW IT load, or 60 kVA three phase

Equipment on the circuit, backup time needed, site location, and any deadline.

Call
Reply within one working daySite survey before anything above 20 kVAAny make serviced