Skip to content
Manufactured in Pune

Automatic transfer switches, 10 A to 150 A

The supply you are on fails, and the load moves to the one that has not — with nobody at the panel. 10 A to 150 A, single phase and three phase.

10–150 ASingle & three phaseAutomatic changeover
Get a quote

Request a quote

About Automatic Transfer Switch (ATS). We reply within one working day.

e.g. 12 kW IT load, or 60 kVA three phase

Equipment on the circuit, backup time needed, site location, and any deadline.

Changeover switch enclosure with separately labelled UPS, bypass and output phase-and-neutral terminal blocks
Current rating
10 A – 150 A
Phases
Single phase and three phase

More views of the Automatic Transfer Switch (ATS)

  • Automatic Transfer Switch (ATS) — detail
    Detail
  • Automatic Transfer Switch (ATS) — terminations
    Terminations
  • Automatic Transfer Switch (ATS) — installed on site
    Installed on site
How it works

And when it’s the right answer

An ATS watches the incoming supply and, when it fails or drifts outside limits, transfers the load to a second source. When the first supply comes back and stays back, it hands the load over again. Nobody has to be at the panel for either half of that.

The mechanism is what matters more than the electronics. The two sides are interlocked so both sources can never be connected at the same time — that is the whole safety case for a changeover switch, and it is built into the mechanism rather than left to control logic to remember.

We build these from 10 A to 150 A, in single phase and three phase. On a standard 415 V three-phase board, 150 A is a little over 100 kVA of connected load; on a 230 V single-phase board it is around 34 kVA. Above that range this is not the right switch — tell us the load and we will say so.

vs Manual changeover switch

A manual switch needs somebody standing at it. Anywhere unmanned, or on a load where a few minutes of downtime is costly, that is not good enough.

vs A UPS on its own

A UPS bridges seconds to minutes on its battery. An ATS bridges for as long as the second supply holds. On a serious installation you have both, with the UPS covering the gap while the changeover happens.

Typical duty

Where these get installed

  • Mains to standby-supply changeover in commercial buildings
  • Hospital essential-services sub-boards
  • Server room and IT distribution boards
  • Machine and process sub-panels
  • Telecom sites and BTS
  • Cold storage plant rooms
Rating plate

Full specification

Typical values for the standard build. Every unit is configured to order — the figures on your general arrangement drawing are the ones that apply.

Get a quote

Request a quote

About Automatic Transfer Switch (ATS). We reply within one working day.

e.g. 12 kW IT load, or 60 kVA three phase

Equipment on the circuit, backup time needed, site location, and any deadline.

Technical specifications
Current rating10 A – 150 A
PhasesSingle phase and three phase
Specified for

Sectors that buy this

Automatic Transfer Switch (ATS) — questions we get asked

Anything not covered here, call us — most of it is faster to answer on the phone.

Do you make single phase and three phase?

Both, across the whole 10 A to 150 A range. Which one you need follows from the board it is going into rather than from the switch — a single-phase board takes the single-phase unit, a three-phase board the three-phase one.

How is the rating chosen?

By the full-load current of the distribution downstream of the switch, with headroom on top. The common mistake is sizing against the source instead: the rating of the incoming supply, or of the generator, tells you nothing about what the connected load actually draws.

What if my load is above 150 A?

Then this is not the product. 150 A is the top of the range, and there is no sense specifying a switch at its own limit anyway. Send us the load figures and we will tell you straight whether we can help.

Coverage

Where we supply and attend

Automatic Transfer Switch (ATS) units are built at our Pune works and delivered, installed and commissioned across the city and the industrial belt around it.

Outside these areas we contract individually against distance, and we will tell you honestly if the response time you need is not one we can hold to. All areas served

After it’s installed

We service what we build, and what everyone else builds too.

Get a quote

Request a quote

About Automatic Transfer Switch (ATS). We reply within one working day.

e.g. 12 kW IT load, or 60 kVA three phase

Equipment on the circuit, backup time needed, site location, and any deadline.

Call