Skip to content
Industrial Battery Charger

SMPS battery chargers

5 A – 30 A

High-frequency switching, modular construction, hot-swappable rectifier modules. Roughly a third the footprint of an equivalent thyristor charger and around 92% efficient, with a controller that manages float, boost and battery health without intervention.

Get a quote

Request a quote

About SMPS Battery Charger. We reply within one working day.

e.g. 12 kW IT load, or 60 kVA three phase

Equipment on the circuit, backup time needed, site location, and any deadline.

Full Industrial Battery Charger range
5 A – 30 A
Rated capacity
Real output at 0.8 pf
Battery bus
1 phase
Input supply

SMPS Battery Charger — rating card

SMPS Battery Charger — rating card
Output24 / 48 / 110 / 220 V DC
Current5 A – 30 A (modular)
Module rating5 A / 10 A hot-swap
Efficiency> 92%
RedundancyN+1, module fail does not drop output
Ripple< 0.5% RMS
ControllerLCD, event log, RS-485 / SNMP optional

Typical values for the standard build. Configured to order — your general arrangement drawing carries the figures that apply.

SMPS Battery Charger — questions

Anything not covered here, call us — most of it is faster to answer on the phone.

What happens if one SMPS module fails?

In an N+1 configuration the remaining modules pick up the load with no interruption and the controller raises an alarm. You swap the failed module live, without shutting the charger down.

Other capacities

Coverage

Where we supply and attend

SMPS Battery Charger units are built at our Pune works and delivered, installed and commissioned across the city and the industrial belt around it.

Outside these areas we contract individually against distance, and we will tell you honestly if the response time you need is not one we can hold to. All areas served

Not sure this is the right size?

Send the load list. Sizing against inrush rather than running load is where most undersized installations go wrong, and it costs nothing to check.

Get a quote

Request a quote

About SMPS Battery Charger. We reply within one working day.

e.g. 12 kW IT load, or 60 kVA three phase

Equipment on the circuit, backup time needed, site location, and any deadline.

Call
Reply within one working daySite survey before anything above 20 kVAAny make serviced