Skip to content
Static Frequency Converter

400 Hz frequency converters

15 – 200 kVA

Ground power for aircraft servicing and aerospace test benches. 115/200 V three-phase at 400 Hz, held to ±0.01%, with the voltage regulation and transient response that avionics testing demands.

Get a quote

Request a quote

About 400 Hz Frequency Converter. We reply within one working day.

e.g. 12 kW IT load, or 60 kVA three phase

Equipment on the circuit, backup time needed, site location, and any deadline.

Full Static Frequency Converter range
15 – 200 kVA
Rated capacity
Real output at 0.8 pf
Battery bus
1 phase
Input supply

400 Hz Frequency Converter — rating card

400 Hz Frequency Converter — rating card
Capacity15 – 200 kVA
Output115/200 V 3φ, 400 Hz
Frequency stability±0.01%
Voltage regulation±1% static, ±5% transient
THD< 3%
StandardMIL-STD-704 / ISO 6858 compliant output
FormFixed, or trolley-mounted GPU

Typical values for the standard build. Configured to order — your general arrangement drawing carries the figures that apply.

400 Hz Frequency Converter — questions

Anything not covered here, call us — most of it is faster to answer on the phone.

Can this be supplied as a mobile ground power unit?

Yes. Trolley-mounted with the aircraft cable and connector fitted, so it can be moved between stands. Tell us the connector type and cable length at the enquiry stage.

Other capacities

Coverage

Where we supply and attend

400 Hz Frequency Converter units are built at our Pune works and delivered, installed and commissioned across the city and the industrial belt around it.

Outside these areas we contract individually against distance, and we will tell you honestly if the response time you need is not one we can hold to. All areas served

Not sure this is the right size?

Send the load list. Sizing against inrush rather than running load is where most undersized installations go wrong, and it costs nothing to check.

Get a quote

Request a quote

About 400 Hz Frequency Converter. We reply within one working day.

e.g. 12 kW IT load, or 60 kVA three phase

Equipment on the circuit, backup time needed, site location, and any deadline.

Call
Reply within one working daySite survey before anything above 20 kVAAny make serviced