Skip to content
Online UPS

80 kVA three-phase online UPS

80 kVA

64.0 kilowatts, three phase in and three phase plus neutral out, from the EPS-3PH3PH-SERIES. A floor of CNC, or a mid-size server room with its cooling on the same board.

Get a quote

Request a quote

About 80 kVA Online UPS. We reply within one working day.

e.g. 12 kW IT load, or 60 kVA three phase

Equipment on the circuit, backup time needed, site location, and any deadline.

Full Online UPS range
80 kVA
Rated capacity
64.0 kW
Real output at 0.8 pf
360 V
Battery bus
3 phase
Input supply

80 kVA Online UPS — rating card

80 kVA Online UPS — rating card
SeriesEPS-3PH3PH-SERIES
Rated capacity80 kVA
Rated output power64.0 kW
Input configuration3 phase + neutral, 380 / 400 / 415 VAC
Input voltage range330 V – 480 V
Output configuration3 phase + neutral + ground
Rated output voltage380 / 400 / 415 VAC ±1%
Battery voltage360 V
TopologyTrue double conversion online
Transfer time0 ms (true online)
EfficiencyUp to 96%
Output waveformPure sine wave
THDv (linear load)< 3%
THDv (non-linear load)< 5%
Output power factor0.8 lag
Voltage regulation±1%
Overload capacity110–150%: 30 s · > 150%: 2 ms
Input frequency48 – 52 Hz
Input power factor> 0.90 (PFC)
Output frequency50 Hz
Battery typeExternal tubular and SMF
Charge currentAdjustable 1 A – 12 A
Recharge time< 8 hrs to 90% capacity
Battery protectionOver-voltage / under-voltage
Operating temperature0 °C – 40 °C
Humidity5% – 95%, non-condensing
CommunicationRS-232
Protection classIP20
CoolingForced air, variable speed fans
MobilityHeavy-duty caster wheels

Typical values for the standard build. Configured to order — your general arrangement drawing carries the figures that apply.

80 kVA Online UPS — questions

Anything not covered here, call us — most of it is faster to answer on the phone.

What incoming supply does a 80 kVA UPS need?

Roughly 120 A per phase on a 415 V three-phase input at full load, so protection is normally the next MCCB size above that. The input window is 330 V to 480 V, wide enough that most MIDC feeder sag is absorbed without the machine going to battery. We issue the cable schedule and protection sizing with the general arrangement drawing.

How much space does a 80 kVA installation need?

The cabinet is one thing and the battery bank is another, and at this rating the bank is usually the larger of the two. Runtime, cell type and whether the bank is racked or floor-standing all change the footprint, so the survey covers the room, the ventilation, the floor loading and the access route before anything is quoted.

Can two 80 kVA units run in parallel?

Yes, but parallel and redundant configurations are engineered against the load rather than picked from a range. Tell us whether you want N+1 for redundancy or units in parallel for capacity — those are different designs, and the switchgear and battery arrangement differ with them.

Other capacities

Coverage

Where we supply and attend

80 kVA Online UPS units are built at our Pune works and delivered, installed and commissioned across the city and the industrial belt around it.

Outside these areas we contract individually against distance, and we will tell you honestly if the response time you need is not one we can hold to. All areas served

Not sure this is the right size?

Send the load list. Sizing against inrush rather than running load is where most undersized installations go wrong, and it costs nothing to check.

Get a quote

Request a quote

About 80 kVA Online UPS. We reply within one working day.

e.g. 12 kW IT load, or 60 kVA three phase

Equipment on the circuit, backup time needed, site location, and any deadline.

Call
Reply within one working daySite survey before anything above 20 kVAAny make serviced